Qualified SWPPP Practitioner and Developer (QSP/QSD) Practice Test

Session length

1 / 20

If the rainfall erosivity factor reaches 5 or above, which action is triggered?

The LRP shall be required to apply for coverage under this order.

Rainfall erosivity measures how strongly rainfall can detach and transport soil. When this factor reaches 5 or above, the erosion potential is high enough to require formal stormwater permit coverage. In this case, the appropriate action is that the Low Risk Permit must apply for coverage under the order, ensuring the site is regulated and implements the required controls. Proceeding without coverage, seeking a waiver, or automatic permit renewal do not align with the increased erosion risk indicated by a high R value.

The discharger may proceed without coverage.

The waiver remains in effect.

The permit is automatically renewed.

Next question

Find the option that is right for you!

All options are one-time payments.

$12.50

30 day premium pass

All the basics to get you started

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 30 day premium pass access
👑$30.00 $87.50 usd

6 month DELUXE pass (most popular)

Everything with the 30 day premium pass FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • Everything included in the premium pass
  • $87.50 usd value for $30.00! You save $57.50!
  • + Access to the ultimate digital PDF study guide
  • + 6 months of premium pass access
  • + Priority support
$12.50 $18.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy